19 Nov Installing the Natural Floor, Part 3
Cork, hardwood, tile and wool carpet – installed in five days and looking great seven weeks laterAs should be done with all new construction projects, moisture levels were monitored for weeks before the hardwood flooring installation began. After acclimating the boxes of flooring on-site for three days, the transformation began. It took five days: